The planned new Allmend primary school building aims to create a future-proof, sustainable, and pedagogically functional infrastructure for primary grades 1 through 6. The four-story building will be constructed using co…
nventional timber framing on the school grounds, replacing the existing outdoor sports facility ("Red Square"). The geological and hydrogeological conditions on the site are considered challenging. In particular, two separate groundwater aquifers must be taken into account. The soil conditions neces
sitate a pile foundation (concrete displacement piles), including timber piles for utility lines and inspection chambers. With regard to flood protection, the new building meets the requirements for a 300-year flood event (HQ300). Building