- Art
- services (planning)
- Referenznummer
- 048275-2026
- CPV
- 71300000
A single operational facility will be stood up to facilitate high priority test activities. This facility is likely to be an existing commercial lease unit. Enabling initial operations to occur, with a later migration …
to bespoke buildings in 2-4 years’ time, these will be located on or close to the West Burton Power plant site – a repurposed Coal Fired Power station site, that will accommodate the novel Prototype Fusion Power Plant being delivered by STEP.
The tests that will be accommodated in this facility wi
ll involve many FOAK physical test rigs comprising of; Scaled Superconducting Magnets Testing, High Power Microwave Testing, Novel Cooling Cycle testing through high temperature turbo machinery, Control Room simulator and other smaller acti