- 471641-2025
- Geschätzter Wert
- 2,400,000,000 EUR
- CPV
- 60210000
The Contract comprises the operation and maintenance of the complete system of the Copenhagen Metro, metro lines M1, M2, M3 and M4 (the “O&M contract”). The lines span over 44 stations (30 underground stations and 14 abo…
ve ground stations) and approximately 40 kilometres doubletrack in the Copenhagen area. The metro system operates 24/7 with a varying headway throughout the day. Currently, the metro has approximately 2 million passengers per week on average. This figure is expected to increase in the coming years.
The metro is a fully automated and driverless, GoA4 system, it consists of two separated systems; M1/M2 and M3/M4 each with own control and maintenance center and is operated without any operator staff (e.g. stewards) on the trains. The O&M