- Art
- 26
- Verfahren
- neg-wo-call
- Referenznummer
- 86514-2024
- Geschätzter Wert
- 12,600,000 EUR
- CPV
- 31200000
The accelerated energy transition is currently causing serious bottlenecks in the energy supply in the Liander service area, with undesirable social consequences and related public attention caused by broad concerns in s…
ociety. Against this background, Alliander wishes urgently to purchase a retrofit solution for existing Magnefix MD medium voltage switchgear installations for enhancement with measurement of current and voltage on all MV cable fields. Maximizing the hosting capacity of existing grids is an importan
t strategy of Distribution System Operators (DSOs) to keep pace in the facilitation of renewable energy sources and electrification of loads. This requires more real time information from the network and solutions for autonomous transport c