- Art
- 25
- Verfahren
- neg-wo-call
- Referenznummer
- 678331-2025
- Geschätzter Wert
- 1,473,983,887 EUR
- CPV
- 45000000
The Fehmarnbelt Fixed Link Project (‘Project’) is the final stage in the realisation of a straight traffic corridor between Scandinavia and continental Europe. It will be an immersed tunnel containing two dual carriagewa…
ys and a twin-track railway traversing the 19 km distance across the Fehmarnbelt between Lolland in Denmark and Puttgarden in northern Germany. The immersed tunnel elements will be manufactured at a pre-designated site at Rødbyhavn on Lolland (‘Production Site’). The Principal Contracts are: 1) Tunn
el Dredging and Reclamation Contract; 2) Tunnel North Contract; 3) Tunnel South Contract; and 4) Tunnel Portals and Ramps Contract. This notice concerns 2) Tunnel North Contract which was awarded to the consortium, Femern Link Contractors (