Start

RegioSpeicher Mosbach - EPC - Engineering, procurement and construction (EPC) of a lithium-ion battery storage facility with 10 MW of active power consumption

Frist:17 Aug 2026, 00:00 CEST

Ausschreibungsinformationen

TED EU

Aachen, Germany

Art
17
Verfahren
neg-w-call
Referenznummer
512696-2026
CPV
45317000

Founded in 1999, Trianel GmbH ("Trianel") is a joint venture of independent municipal utilities based in Aachen. As a Europe-wide municipal utility cooperation, Trianel taps the potential of liberalized energy markets by

Alle Ausschreibungsinformationen anzeigen

Dokumente

Alle wichtigen Termine anzeigen