Two Phase Design-Build/Design-Bid-Build (DB/DBB) Multiple Award Task Order Contract (MATOC) for Construction of the Ground Based Strategic Deterrent (GBSD) Utility Corridor (UC) at Francis E. Warren Air Force Base (FEW AFB), Wyoming (WY)
Frist:17 Jun 2026, 15:00 GMT-4
Ausschreibungsinformationen
SAM.govOMAHA, United States
- Art
- Solicitation
- Verfahren
- Solicitation
- Referenznummer
- c52f797dec534f4b9906d79bd514e5ee
- NAICS
- 237130
21 May 2026: Reference Amendment 0003 to view the Site Visit Attendance List GBSD Utility Corridor 20May26. $1.7B UNR TWO-PHASE DB/DBB MATOC FOR CONSTRUCTION OF THE GBSD UTLITY CORRIDOR AT F. E. WARREN AFB, WY. Reference…