Two Phase Design-Build/Design-Bid-Build (DB/DBB) Multiple Award Task Order Contract (MATOC) for Construction of the Ground Based Strategic Deterrent (GBSD) Utility Corridor (UC) at Francis E. Warren Air Force Base (FEW AFB), Wyoming (WY)
Frist:08 Jul 2026, 15:00 GMT-4
Ausschreibungsinformationen
SAM.govOMAHA, United States
- Art
- Solicitation
- Verfahren
- Solicitation
- Referenznummer
- a18c11ad44ca440a9a0d2e282c5270bb
- NAICS
- 237130