Start
Geschlossen

Two Phase Design-Build/Design-Bid-Build (DB/DBB) Multiple Award Task Order Contract (MATOC) for Construction of the Ground Based Strategic Deterrent (GBSD) Utility Corridor (UC) at Francis E. Warren Air Force Base (FEW AFB), Wyoming (WY)

Frist:02 Jun 2026, 15:00 GMT-4

Ausschreibungsinformationen

SAM.gov

OMAHA, United States

Art
Solicitation
Verfahren
Presolicitation
Referenznummer
e87e4b50d5764bf299aac18dd260906a
NAICS
237130

$1.7B UNR TWO-PHASE DB/DBB MATOC FOR CONSTRUCTION OF THE GBSD UTLITY CORRIDOR AT F. E. WARREN AFB, WY. Reference Section 00 00 00 Procurement and Contracting Requirements for additional not included on the SF 1442 descri

Alle Ausschreibungsinformationen anzeigen

Dokumente

Alle wichtigen Termine anzeigen