- Art
- Contract notice
- Verfahren
- Open
- Referenznummer
- ed8d5e9c-4547-401a-ad59-ca30172727bf
- CPV
- 34940000
The Rhaetian Railway (RhB) intends to initiate the migration of its infrastructure and rolling stock to a cab signalling system. The objective of this project is to establish the technical and operational basis for the f…
uture network-wide implementation of cab signalling.
The section Susch – Zernez is defined as the initial implementation section and will serve as a pilot project. This tender process aims to establish a binding system decision, which will form the basis for the subsequent network-wide rollout of c
ab signalling across the RhB network.
As of the timetable change in December 2031, a minimum train headway of two minutes shall be ensured on the Sagliains – Zernez section. In order to fulfil this requirement, the existing line section sh