Start

Power Supply S10: Overall Project Management, Civil Engineering and Cabling Design (SIA Phases 41–53)

Frist:25 Jun 2026, 16:00 CEST

Ausschreibungsinformationen

CH_SIMAP

Zürich, Switzerland

Art
Contract notice
Verfahren
Open
Referenznummer
d645b54a-acbb-41eb-9057-d7089d54aa0e
CPV
71000000

In accordance with the power supply concept of SBB Region East, SZU intends to install a power switchgear station (LSP) as an indoor facility in a room on the second basement level of a residential complex currently unde

Alle Ausschreibungsinformationen anzeigen

Dokumente

Alle wichtigen Termine anzeigen