There will be an ongoing requirement for STCRIDs, which will not diminish by the roll-out of the PCRID contract as anticipated. The STCRID was to be superseded by the PCRID but we are now aware that this is not the case.…
Therefore, a new strategy is required for the STCRID which needs time to formulate due to a number of key decisions (new design, existing design includes obsolence) and this SSR will permit the time.
A new strategy has been determined as a means to achieve a permanent solution, however until such t
ime as that strategy is enacted there is an ongoing need for ST-CRID repairs, renewals and recalibrations in order to keep the c.4,000 units in use across the network operational and safe.
With an average periodic spend of c£25,000 the sum