For the hydrogen storage are 3 Hydrogen dehydration package(s) needed. In the first project phase 2 Hydrogen dehydration package(s) are needed in 2026/2027. In a next project phase, around 2030 another Hydrogen dehydrati…
on package is needed to grow in line with the total capacity storage plant then has. The scope of the contract includes: • Engineering of the whole system (battery limit at gas inlet and outlet nozzles of absorption columns) • Delivery of equipment • Assembly and delivery of skids (including skid mo
unted piping and wiring of instrumentation) A Hydrogen dehydration package should at least consist of the following elements: • Glycol contactors (2 + 1 spare) • Glycol Recovery Units (2 + 1 spare) (Electrically heated) • Lean glycol vessel