- Type
- 16
- Procedure
- open
- Ref. number
- 743176-2025
- Estimated value
- 100,000,000 NOK
- CPV
- 45000000
Notodden municipality (org.nr. 938 583 986) shall rebuild Heddal secondary school for Sem primary school The works shall be carried out as a turnkey contract, the assistant building is a two storey school building, with …
a technical room on the second floor, the existing gross area is approx. 4,000 m2 The existing school consists of 3 parts. Building A includes classrooms for food and health, building B includes i.a. a gymnasium with changing rooms and rooms for janitors, and building C that includes classrooms and
personnel rooms. The vestibule connects the three parts together and contains the ampitheatre with the library. The gross area shall be divided in three places to approx. 1,850 m2. The extension B shall be constructed at the gym hall (bu