Fingrid Oyj, the Finnish national power transmission system operator, is planning to build several new overhead transmission lines (OHTL) during 2024...2028. The construction of new lines is part of large investment prog…
ram to reinforce the grid and make fossil-free transition of electricity system possible in Finland. The lines will be designed and built for voltage levels 400 kV and 110 kV. The construction of OHTLs, including stringing of conductors, will be performed as turnkey contracts by specialized transmis
sion line construction contractors employed separately by Fingrid. However, outside of these contracts is delivery of conductors, which Fingrid will procure by himself. The total amount of conductors needed during 2024...2028 is about 30 00