- Type
- 30
- Procedure
- neg-w-call
- Ref. number
- 693469-2025
- Estimated value
- 11,350,000 EUR
- CPV
- 31400000
The Battery Energy Storage System (BESS) is to be installed within the perimeters of the power station Avedøreværket, located in Avedøre (Hammerholmen 50, 2650 Hvidovre), Denmark. The BESS will be sized for aminimum of 2…
0 MW usable capacity capable of operating for approx. 2 hours at nameplate rating. The purpose of the BESS is to provide the ancillary services FCR-N (“Frequency Containment Reserve for Normal operations”), FCR-D (“Frequency Containment Reserve for Disturbances”) and FFR (“Fast Frequency Response”),
aFRR and mFRR (“automatic/manual Frequency Restoration Reserve”) for participation in the regulation of the electrical transmissionsystem DK2 that is within responsibility of the Transmission System Operator (TSO) Energinet Elsystemansvar