The scope of this envisaged contract is the supply of the Radiofrequency (RF) Power System. It is responsible for generating, amplifying, managing, and delivering high-power RF signals to various accelerator radiofrequen…
cy cavities, including the RFQ (Radiofrequency Quadrupole cavity), MEBT (Medium Energy Beam Transport line) re-buncher cavities, and HWR (Half-Wave Resonator) cavities of the SRF (Superconducting Radiofrequency) LINAC (Linear Accelerator). It also compensates for cavity field variations caused by fa
ctors such as beam loading, thermal dilation, and amplifier gain drift to maintain the required amplitude and phase of the accelerating voltage for proper deuteron acceleration. The International Fusion Materials Irradiation Facility (IFMIF