As part of the scope of this tender, the Contractor shall be responsible for the design and construction of two microtunnels (MTs). Each microtunnel shall accommodate ducts for three high-voltage direct current (HVDC) po…
wer cables and fibre optic cables. The landfall for the planned Ostwind 4 (OW4) HVDC cable system is located in Vierow, on the shores of the Greifswalder Bodden in Mecklenburg-Western Pomerania, Germany. For this landfall, the construction of one microtunnel with cable ducts is foreseen. The landfal
l for the planned Bornholm Energy Island (BEI) HVDC cable system is likewise located in Vierow, at the Greifswalder Bodden. Here, the construction of one microtunnel with cable ducts is also planned. The landfall for the BEI project on the