The Contracting Entity intends to procure a contract for the design, manufacture, installation (Option) and commissioning of 3 x FGD ash injection (LOT 1) and/or 1 x batching plant ash injection systems (LOT 2). ESB as t…
he contracting entity, will be responsible for reclaiming the ash from the ASA and locating it into newly designed and constructed ash unloading facility, at the base of the planned injection systems. It is proposed that the Contract will include the design, manufacture, Installation (Option) and co
mmissioning of 3 x FGD (LOT 1) and 1 x batching plant (LOT 2) ash injection systems. The proposed systems will be capable of elevation and subsequent injection of ash, with the stated properties, to the 3 x unit FGD’s at elevations of circa