Following the completion of Phase A in 2023, MSDPC are seeking to progress Phase B in the planned tender competition to which this engagement refers. Phase B- a. Athletics ‘D’ Area- To westside of the existing pitch, to …
include 21m Shotput throw field and High Jump area in Conipor SP, 13mm thick polyurethane track system and athletic surfacing. b. Long jump- Running Track Sprint surface finish by Conipor SP, 13mm thick polyurethane track system and athletic surfacing, with a PUR-bound elastic layer based on recycle
d granules and a 3 mm PUR spray coating as a top layer, or equal approved to IAAF standards, laid in accordance with manufacturer’s instructions. c. Warm Up Area ‘D’- To eastside of the existing pitch, to be constricted in detail and specif