The scope of the Framework Contract includes the provision of engineering services for the design of two systems within the mechanical plants of the ITER machine: the Isotope Separation System (ISS) and the Water Distill…
ation System (WDS). These systems are responsible for processing tritiated water and hydrogen isotope gas streams. The contract involves finalizing the design work for both systems in preparation for their manufacturing, as well as tasks such as component qualification and support to the owner.
The scope of the Framework Contract includes the provision of engineering services for the design of two systems within the mechanical plants of the ITER machine: the Isotope Separation System (ISS) and the Water Distill