- Type
- 30
- Procedure
- neg-w-call
- Ref. number
- 246121-2025
- Estimated value
- 62,960,042 NOK
- CPV
- 45100000
Hafslund Celsio has entered into a rent contract for the lighthouse at Aker Hospital. The contract means that Celsio will take over responsibility for the operation, and it is given the opportunity to develop the boiler …
house. The lighthouse currently consists of an electrode boiler that produces steam, as well as two oil boilers that have been banned from operation. Since the hospital was connected to the district heating network in 2019, the steam boiler has only functioned as a stand-by boiler. Celsio would like
to develop the lighthouse so that it can function as a peak load central for the grorud network. The existing boiler shall continue to be operated, but the two discarded oil boilers shall be replaced with two new hot water boilers, 13 and