- Type
- 17
- Procedure
- neg-w-call
- Ref. number
- 680795-2024
- Estimated value
- 200,000,000 DKK
- CPV
- 71300000
The 3xR Project (Re-signaling and Rolling Stock Replacement), by Metroselskabet, is an essential upgrade of the M1 and M2 lines with a new signaling system and additional rolling stock. This major brownfield reinvestment…
should be designed to address the demands of Copenhagen’s growing population and to continue providing excellent service. The current systems will no longer be supported after 2035, and the seamless switch to a new, driverless signaling system, along with the addition of 42 new trains is required t
o be implemented within the next Operations & Maintenance contract period. The transition from the existing systems to advanced, cutting-edge technology must minimize disruptions to service and the successful execution and anticipated outco