The Contract involves the delivery of Precipitation gauges and third line maintenance on behalf of the Royal Netherlands Meteorological Institute (KNMI) as the Contracting Authority. The motivation behind this project is…
based on the need to replace the existing KNMI designed Precipitation gauges that have been used in KNMI’s automated network of Precipitation gauges since 1992. The scope of this European tender is to purchase a catchment style Precipitation gauge that adheres to WMO specifications for precipitatio
n accumulation, intensity, and duration. If Supplier can not offer a catchment style gauge that can report duration with the required accuracy, then Supplier can include an additional precipitation monitor/detector in its offer to operate i