- Type
- 29
- Procedure
- neg-w-call
- Ref. number
- 777542-2024
- Estimated value
- 280,000 EUR
- CPV
- 38636000
ELI-NP is currently undergoing the implementation and construction of the gamma beam system. This system will deliver quasi-monochromatic gamma beams, with energies up to 19.5 MeV and characteristics such as low bandwidt…
h (≤ 0.5%), high spectral density (≥ 5× photons / s / eV) and high degree of linear polarization (≥ 95%). The ultimate objective is to build a fully functional gamma beam system in accordance with the Technical Design Reports (TDRs) established by the international scientific community at the propos
al of the financing project. The optical test cavity that is the object of this acquisition will be used for the implementation and evaluation of some technologies that will be used for the design and construction of the final optical cavit