- Type
- Presolicitation
- Procedure
- Presolicitation
- Ref. number
- 8e5d772ff7eb45a885f381f12b835178
- NAICS
- 238210
***SEE ATTACHED PERFORMANCE WORK STATEMENT AND SALIENT CHARACTERISTICS*** The proposed contract action is anticipated to be full and open compitition it requires installation of electrical outlets inside the two Large Ar…
ea Maintenance Shelter (LAMS) to support Cargo. Deployment Function (CDF) operations. Each tent requires six 230-volt outlets, for a total of twelve outlets. The requirements include all parts and labor necessary to complete the electrical outlets installation. All electrical installations must comp
ly with the National Electrical Code (NEC/NFPA 70) for U.S. requirements and Verband der Elektrotechnik (VDE) standards for German Electrical Installations, and all applicable civil engineering regulations. IAW RFO 5.101(c)(2): Set asides a