- Type
- award, contract
- Procedure
- Below threshold - award under framework
- Ref. number
- 055193-2026
The project comprises of removal and replacement of the existing boilers within the existing boiler room.
The works include the following:
Removal of existing boiler plant and sections of existing associated pipework
Pow…
erflush, clean and flush existing heating system
Installation of new natural gas fired condensing boiler
Installation of new header, shunt pump and associated pipework and fittings
Modification of existing flue and installation of new to suit new boiler (via specialist contractor).
Modification of e
xisting boiler room heating circuits and installation of new to suit new boiler arrangement
Modification of existing and installation of gas safety solenoid valve and associated controls
Modification of existing controls to accept outside a